info@australialift.com+61 476 303 336Availability confirmed for your suburbRequest lift service
P
For professionals

Designing with a home lift.

Figures and project guidance for architects, builders, designers and occupational therapists working on Australian homes.

Let’s talk about your home
Low-rise glass lift beside lit stone steps in a contemporary home

The details you need,
when you need them.

A home lift is easier to resolve on the drawings than on site. This page brings together the published figures for each model and the points to settle at each stage, for architects, builders, interior designers and occupational therapists.

Working on a multi-residential or commercial project? Tell us what the building needs. We confirm suitability project by project.

Discuss a project
Technical summary

Three models,
side by side.

Published figures. Final dimensions and suitability are confirmed in your written specification.

DetailAustraliaLift EssentialAustraliaLift SignatureAustraliaLift Freedom
Footprint1.06–1.39 m² installation space1.10–2.56 m² required opening2.94 m² overall
Capacity250 kg / 2 passengers350 kg350 kg
Travel speedConfirm against the factory datasheet0.10 m/s0.10 m/s
DoorFull-height or half-height; access layout specified per installationTempered glass; access and hinge orientation specified per installation180° through access or 90° side access
PowerSingle phase 220 V / 15 A; 24 V DC controls24 V DC controls; mains supply specified at quotation240 V AC
DriveHydraulicHydraulicHydraulic
FinishesClear Perspex and aluminium frameTempered glass and aluminium frameAluminium-alloy enclosure and tread plate platform
Standard installationTypically 1 working day after site preparationTypically 3 days for two storeys after site preparationTypically 1 working day after site preparation
Warranty5 years5 years5 years
Starting price (AUD)From $18,500From $32,900From $22,900
White-framed glass home lift on an upper landing with a glass balustrade
From brief to handover

What to settle,
at each stage.

  • Concept

    Share the number of levels, who will use the lift and the space you are considering. We can talk through which model suits the brief.

  • Design development

    Footprint, door type and finishes are settled against the plans. Allow for the lift early, because a retrofit depends on the structure and layout.

  • Site assessment

    We inspect access and structure before installation at no charge, and recommend the most suitable configuration.

  • Construction

    The Site Preparation Guide sets out the minimum structural requirements and is provided on order confirmation.

  • Handover and care

    Testing and commissioning, a walkthrough for the people using the lift, and an annual service plan.

Drawings and documents

Ask for what
your project needs.

Files are not published here yet. Tell us your project and model, and our team will let you know what is available.

Request project information
  • Site Preparation Guide

    Minimum structural requirements

    Provided on order confirmation
  • Technical drawings

    Plans, sections and clearances

    Not yet published. Ask our team
  • CAD and BIM files

    Objects for design models

    Not yet published. Ask our team
  • Product catalogue

    Models, finishes and options

    Not yet published. Ask our team
  • Compliance documents

    Standards and certification

    Ask our team for your project

Make room for
everyday movement.

The available space, the number of levels and the people using the lift are the starting points. Bring these details to your site assessment so we can discuss the right model and placement.

White-framed glass lift beside an open timber staircase
Placement inspiration from Australia Lift. Model and project location are not identified.

Start with the space.

For a new home or an existing property, our installation service begins with consultation and a site assessment.

  • Available space and number of levels
  • Access and mobility requirements
  • Preferred finishes and door configuration
Explore installation support
AI-generated concept showing steel, glass, stone and oak materials

AI material study, not a specification of available finishes.

View placement ideas
Built-in protection

Safety is
never optional.

These systems are part of the Australia Lift range. Your specification sets out exactly what is fitted to your lift.

  1. Over speed governor

    Engages to stop the lift if it exceeds safe speed limits.

  2. Battery backup

    Supports safe operation and descent during a power outage.

  3. Full-height light curtain

    Infrared sensors detect obstructions across the door opening.

  4. Weight limit sensors

    Prevent operation when the load exceeds rated capacity.

  5. Out of balance sensors

    Detect uneven load distribution and halt operation.

  6. Fall arrest mechanism

    A secondary system to prevent uncontrolled descent.

Your home.
A new perspective.